Develop a plan for testing accesses

Description

Options:

  1. Run-time options to vary for tests.

  2. Compile-time options to vary for tests.

  3. Compile- or run-time options to add.

  1. DONE

    : Verify that that the reads are actually using the parallel code.

  2. DONE

    : Run a set of reads with bes_serial.conf and bes.conf - compare times

  3. DONE

    : Get the whole file - get the time

  4. Find the cross-over point.

  5. DONE

    : Build code with keep-alive off

    1. DONE

      : Run the serial code that way, maybe the parallel code too.

  • Re-run the tests using a production build.

  • Measure the transfer-only time.

Done

Assignee

Unassigned

Reporter

James Gallagher

Labels

None

Sprint

None

Priority

Medium